Full Text Transcript
Text below was recognized via OCR from scanned pages and may contain minor errors. Mathematical formulas and symbols may be approximate - please refer to the PDF for the exact equations.
= Services (Main)
2 8 SNCS-T-CVLE
Examination, 2026
CIVIL ENGINEERING
PAPER—II
Time Allowed : Three Hours - Maximum Marks : 300
QUESTION PAPER SPECIFIC INSTRUCTIONS
Please read each of the following instructions carefully
before attempting questions
There are EIGHT questions divided in TWO Sections.
Candidate has to attempt FIVE questions in all.
Question Nos. 1 and 5 are compulsory and out of the remaining, THREE are to be
attempted choosing at least ONE question from each Section.
The number of marks carried by a question/part is indicated against it.
Wherever any assumptions are made for answering a question, they must be clearly
indicated.
Diagrams/Figures, wherever required, shall be drawn in the space provided for answering
the question itself.
Unless otherwise mentioned, symbols and notations have their usual standard meanings.
Attempts of questions shall be counted in sequential order. Unless struck off, attempt of
a question shall be counted even if attempted partly.
Any page or portion of the page left blank in the Question-cum-Answer (QCA) Booklet
must be clearly struck off.
Answers must be written in ENGLISH only.
SNCS-T-CVLE/74 1 ೫.10.
‘SECTION—A પ
1. (a) The following observations were made for conducting the water budget of
a reservoir over a period of one month of 31 days :
Average surface area =10 km?
Rainfall = 10 cm
Mean surface inflow =10 m°/s
Mean surface outflow =15 103 /s
Fall in reservoir level = 1.50 m
Pan evaporation = 20 cm
Pan coefficient =0-70
Estimate the average seepage discharge during that month. 12
(0) In a recuperation test of a 3 m diameter open well, the water level changed
from 114-60 m to 11570 m elevation in 120 minutes. If the water table
elevation is 1 17:00 m, determine (i) the specific capacity per unit well area of
the aquifer and (0) the discharge in the well under a safe drawdown of 2°75 ௩.
(11) What would be the yield from a well of 4 m diameter for a drawdown of
2:50 m? 12
(જિ A rectangular channel 2 m wide has a flow of 2:5 3 / s at a depth of 1:0 m.
Determine whether critical depth occurs at a section where a hump of height
h=0-2 m is installed across the channel bed. 12
(व) The BOD; of a water sample from a polluted river is determined to be
250 mg/L at 20 °C. The k-value is known to be 0-23 per day. What would be
the BODg, if all tests were run in an air-conditioned laboratory at 15°C? 12
(e) Enumerate any six measures to limit air pollution at a construction site and
describe each in one sentence. 12
2. (a) (i) Backwash operation is an important operation at a water treatment plant.
Compute the quantity and percentage of treated water used in washing as
also the rate of wash water flow in each trough. The following data are
known :
The size of filter unit is 4-0 mx10-0 पा. After filtering 12000 cubic
metres of water in a 24-hour period, the filter is backwashed at the
rate of 12 litres/sq. m/s for 15 minutes. There are 3 troughs. 10
(1) Determine the dimensions of a channel-type grit chamber to remove
particles with a diameter of 0-2 mm and specific gravity of 2-65, Assume
a settling velocity of 0۰018 m/s. The flow-through velocity of 0:35 m/s is
maintained by a proportioning weir. Given that the maximum wastewater
flow is 12000 73 /day and that a rectangular cross-section with depth
=1-5x width at maximum flow is desired. 10
SNCS-T-CVLE/74 2
[=
(०
Consider a water pump discharging at a rate of 0:30 ڈو /s. The diameters of
the discharge and suction nozzles are 300 mm and 350 mm respectively.
The reading on the discharge gauge located 0:30 m above the centreline of
the impeller is 156-96 kN/m2, while the reading on the suction gauge located
at the centreline of the impeller is 19-620 1⁄1 /£୮ 2 Given that the efficiencies of
the pump and motor are 60 percent and 88 percent respectively.
Take : y=9810 1/03
g=9-81 m/s?
The reference datum is the centreline of the pump impeller.
Determine—
¢ the total dynamic head;
(1) the power input required by the pump;
(iii) the power input to the motor. 20
The drag force F on a smooth sphere depends on the relative speed V,
the sphere diameter D, the fluid density p, and the fluid viscosity p. Using
Buckingham 7 theorem, obtain a set of dimensionless groups that can be used
to correlate experimental data. 20
( Solid wastes from construction and demolition sites can be utilized
beneficially by civil engineers. Enumerate five such uses and briefly
describe each in one or two sentences. 10
8 Briefly describe the rotating biological contactor system for municipal
wastewater treatment with the help of a sketch. What are its advantages
and disadvantages? 10
(i) Differentiate between the following in a few lines :
(1) Regular meanders and Irregular meanders
(II) Aggradation and Degradation in rivers
(111) Attracting and Repelling spurs
(IV) Tidal rivers and Delta rivers
(V) Weirs and Flumes 2x5=10
8 What is a canal outlet? What are the requirements to be satisfied by
a canal outlet for its proper functioning? Enlist the factors on which
the choice of type of outlet and its design are governed. Describe the three
types of canal outlets, each in a few lines. 10
( With the help of a sketch, briefly explain boundary layer separation. 10
8 What are the disadvantages of boundary layer separation? In which
hydraulic devices does it occur?
8 What are the methods to control separation of boundary layer? 5
SNCS-T-CVLE/74 3 [ P.T.O.
4. a Sketch the schematic of an activated sludge reactor. It is planned to design
an activated sludge system for secondary treatment of 12000 ௨3 /day of
municipal wastewater. The BOD after primary clarification is 154 mg/L and
the soluble BOD in the effluent should not be more than 4 mg/L. A completely
mixed reactor is to be used, and a pilot plant study has given the following
values :
Y =0-5 kg/kg
kg =0-05/day
6൦ = 10 days
Assuming an MLSS concentration of 4000 mg/L and an _ underflow
concentration of 10000 mg/L from the secondary clarifier, determine—
( the volume of the reactor;
(ii) the mass;
(iii) the volume of solids that must be wasted each day;
(iv) the recycle ratio. 20
(b) A new township is to be set up to house 40000 people for a new dam.
The water for this township has to be sourced from a river 4 km away into
a storage reservoir using pumps. The maximum difference of levels of water
between the river and reservoir is 20 m. The water supply is limited to
100 litres per person per day. The pumps will be operated only 6 hours per day
in two shifts. Given that the efficiency of the pumps is 76%. Determine the
horsepower of the pumps. Given : Friction factor =0-03 and velocity of flow
=2-5 m/s, maximum daily demand is 1:5 times the average daily demand,
available pipe diameters 100, 150, 200, 250, 300, 350, 400, 450, 500, 600,
700 (in mm), g=9-81 m/s? and 1൧ =9-81 kN/m°, 20
(c) The following are the data of gauge and discharge collected at a particular
৷ section of the river by stream gauging operation. Develop a gauge-discharge
relationship for this stream at this section for estimating the discharge for
a known gauge reading. What is the coefficient of correlation of the desired
relationship? Assume the value of gauge reading for zero discharge as 35:00 m.
Estimate the discharge corresponding to a gauge reading of 42-50 m at this
section.
(Note : The gauge-discharge relationship is of the form Q = C, (೧-01, where ౧
is the discharge corresponding to a given gauge reading G, a is a constant
representing the gauge reading corresponding to zero discharge, 6, and 8
are rating curve constants.)
Gauge reading (m)
Discharge (m ತ 16)
Gauge reading (m)
Discharge (5/5)
35-91
| 89 |
45-40
4560
36:90
230
46-43
5305
SNCS-T-CVLE/74
[_
धि
(०
(0)
SECTION—B
In a Casagrande’s apparatus, liquid limit test was performed and the
following results were obtained :
No. of blows 49 39 30 21 15
Water content (%) 33:1 36:0 41:2 46:0 530
If the shrinkage limit and shrinkage index are 16% and 9% respectively,
determine the toughness index and comment on the nature of soil. Also
classify the soil as per the Indian standard.
Draw the influence lines for the vertical stress and shear stress intensities at
a depth of 2 m below the ground level due to concentrated point load of 100 kN
applied on the ground surface.
The radius of a horizontal curve is 400 m, the total pavement width at curve
is 7-6 m and the superelevation is 0:07. Design the transition curve length for
a speed of 100 kmph. Assume the pavement to be rotated about the inner
edge. Allow a rate of change of superelevation of 1 in 150.
The length of a runway at sea-level, standard atmospheric conditions and
zero gradient is 1500 m. The airport site has an elevation of 900 m, and the
reference temperature is 20°C. If the proposed runway grading permits
an effective gradient of 0:20 percent, determine the actual runway length
required at the site. The ICAO recommends that the basic runway length
should be increased at the rate of 7% per 300 m rise in elevation above the
mean sea level. The ICAO recommends that the length corrected for elevation
should further be increased at the rate of 1% for every 1 °C by which the
airport reference temperature exceeds the temperature in the standard
atmosphere for the airport elevation. The standard temperature at the site
refers to the temperature obtained: by reducing the standard sea-level
temperature of 15 °C at the rate of 6-5 °C per 1000 m rise in elevation. Check
whether the total correction for elevation and temperature exceeds the limiting
value prescribed by the ICAO.
20
12
12
12
12
SNCS-T-CVLE/74 5 [ P.T.O.
| ~
(a)
(b)
0
(i)
0
(i)
0
Define the following terms :
(1) Spectral resolution in remote sensing
(II) Nonspatial data in GIS
(111) Multipath error in GPS
(IV) Faults and folds in rocks
(V) Celestial sphere in astronomy
(VI) Geodetic survey 1x6=6
A vertical aerial photograph was taken with a camera of 21 cm focal
length. On this photograph, a pipeline lying on a flat terrain appears
as 125 mm long, while the same measures 500 m long on the ground.
A TV tower also appears on the photograph and its top and bottom
images are 8-7 cm and 7:2 cm away from the principal point respectively.
Determine the height of the TV tower.
Three aircrafts A, B and C left an airport at 6:00 AM, 6:10 AM and
6:20 AM at speeds 300 kmph, 360 kmph and 450 kmph respectively.
If the aircrafts A, ૭ and C left at reduced bearing N 60° 2, S 76° E and
S 16° E respectively, determine the reduced bearing of lines BA and BC,
and the distances AB and BC, as observed from B at 7:00 AM.
Between two straight lines, a railway curve of 600 m radius is to be
designed. The chainage of point of intersection is (108+09), and the
deflection angle is 30°. Determine the tangent length, apex distance,
length of curve, and the chainages of the beginning, vertex and end points
of the curve. Take one chainage length as 30 m.
Calculate the maximum permissible load that a BG locomotive with
three pairs of driving wheels bearing an axle load of 20 tonnes each can
pull on a straight level track at a speed of 120 kmph. Also calculate the
reduction in speed if the train has to run on a rising gradient of 1 in 100.
What would be the further reduction in speed if the train has to negotiate
a 2° curve on the rising gradient? Assume the coefficient of friction to
be 0-2. The following table summarizes the various resistances faced by
the train :
Nature of resistance Value of resistance
Resistance due to friction 0*0016 W
Resistance due to wave action,
track irregularities, and क| 0-00008 W
Resistance due to wind 00000006 wv?
Resistance due to gradient Wx % slope
100
Curve resistance for BG 0۰0004 WD
SNCS-T-CVLE/74 6
10
10
௮ : W is the total weight of the locomotive and vehicle in tonnes.
V is the speed in kmph.
D is the degree of the curve. 15
(1) What is the use of braking test conducted on a highway? Indicate the
measurements needed during such a braking test. 5
-(८ Two footings, each 2۰5 mx2-5 ஐ, 55 m apart centre-to-centre, are placed on
top of a sandy soil 3 m thick. The load carried by each footing is 1000 kN.
Determine the consolidation settlement of the clay layer 1:5 7) thick,
underlying the sandy layer. The water table is at the base of the footing. The
geotechnical properties of the soils are as follows :
For sandy soil
Specific gravity =2-65
Bulk density =19-0 101/1775
For clayey soil
Bulk density = 16 . 5 1:01 / 3
Liquid limit = 42%
Void 7೩೪೦ = 0 . 80
Assume that the load is distributed in the soil at 2:1 ratio. 20
7. (a) A soil sample is procured from the site and tested in a triaxial apparatus
under consolidated undrained condition. The sample was consolidated at a cell
pressure of 200 kN/m? and a back saturation pressure of 100 kN/m? for
24 hours. On the next day, the cell pressure was increased to 300 kN/m?,
which resulted in the development of a pore pressure of 10 kN/m?. The axial
stress was then gradually increased to 400 kN/ m2, which resulted in a failure
of the soil sample. The pore pressure recorded at failure was 50 kN/m?.
Determine the Skempton’s pore pressure parameters A and B. 20
(b) (¢ A canal 5 m deep runs through a soil with the following geotechnical
properties :
Cohesion =18-5 kN/ m?
Angle of shearing resistance =10°
Void ratio =0-75
Specific gravity = 2-74
The angle of slope of the bank = 45°
Determine the factor of safety, with respect to cohesion—
(1) when the canal runs full up to the top of banks;
(11) during sudden drawdown condition.
SNCS-T-CVLE/74 7 1.30.
The Taylor’s stability numbers for the given slope are as follows :
Angle of shearing resistance 10° 5°
Stability number 0-108 0137
Also comment on the factor of safety for the above two conditions of
the canal. 10
(1) A group of driven piles is proposed to support mat foundation in loose
sand. The group of piles consists of 9 piles, each of diameter 250 mm and
length 10 m. The spacing of piles is 1۰4 m ೦/೦. The results of SPT values
as obtained from the site are as follows :
Depth (m 20 | 40 | 65 | 80 | 90 | 100
SPT value | 8 | 11 7 10 7 | 6 |
Determine the capacity of the pile group. 10
(© (0 Bring out the essentials of railway track maintenance. Through packing
` is one of the major maintenance operations performed in a calendar year
as part of track maintenance. Describe, in brief, how through packing is
carried out in a systematic and sequential manner. ` 10
(ii) What are breakwaters? Explain briefly their types indicating their
suitability. 10
8. (a) Calculate the equivalent C-value of a three-layered pavement section having
individual C-values as given below :
Material Thickness (in cm) C-value
Bituminous concrete 10 | 60 |
Cement-treated_ base 20 225
Gravel sub-base 10 | 15 |
10
(b) What is the role of cohesive non-swelling (CNS) layer in stabilizing slopes
and cuts in embankment? 10
(© (0 What is stabilization of boreholes? 10
(ii) What are the tests required for the identification of expansive soils?
Explain any two tests. 10
` (୩) (ઈ The following consecutive readings are taken with a level instrument and
4 m long levelling staff, on a continuously sloping ground line AB at
a regular distance of 20 m :
0-352, 0787, 1-832, 2-956, 3-758, 0-953, 1-756,
2738, 3:872, 0812, 2:325, 3-137 (in m)
Enter the above readings in tabular form and compute the reduced level
of all the points by rise and fall method, and the gradient of line AB,
if the reduced level of point A is 320-288 m. Apply usual checks. 10
(டு Draw a neat sketch and explain the procedure to layout a culvert on
the ground. 10
kkk
SNCS-T-CVLE/74 8 26BS—2016